Prestige Heights


Prestige Heights developed on a piece of freehold land in Teluk Kumbar comprises 97 units of landed property; 60 units of 2-Storey Terrace, 22 units of 3-Storey Terrace, 14 units of 3-Storey Semi-Detached and 1 unit of 3-Storey Bungalow.

Prestige Heights is within 5 minutes drive to the Penang International Airport, Sungai Ara Town, Bayan Baru township and the F.T.Z. Nearby amenities include schools, wet markets, hypermarket, hospital, financial institutions and shopping malls.

Property Project : Prestige Heights
Location : Teluk Kumbar (Property for sale & rent in Teluk Kumbar)
Property Type : Terrace, Semi-Detached, Bungalow (House for sale & rent)
Tenure : Freehold
Total Units : 97
Developer : PLB Land Sdn Bhd

2-Storey Terrace


3-Storey Terrace


3-Storey Semi-Detached


Site Plan

Location Map

«Oldest   ‹Older   1 – 200 of 405   Newer›   Newest» 405 comments:

August 7, 2008 2:45 PM lp said...

Any contact for this developer? What is the price range?

 
August 7, 2008 2:55 PM Anonymous said...

Developer website http://www.plbhomes.com.my/

 
August 7, 2008 5:38 PM KPLow said...

Could someone call me?
I am now looking for house.

0124932219. Mr. Low

 
August 7, 2008 5:47 PM Anonymous said...

To KPLow,

You can call developer sales person YJ Teh 017-4230799. The price for double storey is 468K, three storey terrace is 568K. Quite cheap compare to other landed property in PG.

 
August 7, 2008 7:56 PM lp said...

yes, but Telur Kumbar there traffic jam :-( any alternate road to Teluk Kumbar from Bayan Lepas?

 
August 11, 2008 4:52 PM lp said...

hi all,

worth to buy for this project? please advise. thanks.

 
August 13, 2008 3:05 PM khorcf said...

Hi,
I think this is considered good in terms of pricing and hopefully with 2nd link it will boost up the price further. Anyway, i just pay deposit for it. Can keep in touch for further sharing.

 
August 13, 2008 3:52 PM lp said...

hi khorcf, nice to meet u. what is ur email address? so that we can keep in touch and sharing.

 
August 13, 2008 10:05 PM Anonymous said...

Khorcf,

How much the booking fee ? Still have a lots unit available ?

 
August 14, 2008 1:47 PM khorcf said...

The deposit is 10k. I heard there are still some units left. The official launching will be in next month as I know. My email address is khorcf@gmail.com. Do keep in touch!

 
August 14, 2008 4:26 PM Anonymous said...

i dare not buy after seeing the result from Serena Bay... PLB homes... i have been following up since last year for this project and wanted to book a unit... but my fren who bought serena bay has a lot of negative comments bout PLB.

 
August 14, 2008 7:10 PM khorcf said...

I heard that before too but was assured by one of my friend who work in PLB that it was under different sub-agent this time. Not sure how true it is. Please share more if you have any news - good/bad thing about it.

 
August 15, 2008 2:34 PM redbliss said...

i've booked a unit. The pricing is worth for a landed property in pg. Moreover, the finishes that the developer provides are consider quite good.

 
August 15, 2008 2:41 PM Anonymous said...

Although i didn't book an unit, but i have visited my fren new house at Juru past weekend, Taman Cendana from developer PLB. Not bad. Stainless steel and auto gate included. The staircase handle also stainless steel. Of course, there is no perfect, their workmanship is a bit sorry. But overall, i think is ok, sure you will renovate your house before move in. Thus, that minor stuff shouldn't be any negative big impact. I have ask one of my fren who stay nearby, said there will be a new road to connect from Teluk Kumbar or Batu Maung to Bayan Lepas. Don't know how's true is that.

 
August 16, 2008 1:07 AM Anonymous said...

am interested on the property..
do u know if the developer has their own bankers to deal with purchasers loan?how many unit is yet avail and when will it be completed..

 
August 16, 2008 2:03 PM khorcf said...

i heard there is a plan to widen the road or so..but not sure when. Yes, there are five bankers that deal directly with this project. And the developer will bear all the legal fees. Not too sure how many have left but heard at least half of them are confirmed. It will be completed in two years time.

 
August 16, 2008 10:22 PM Anonymous said...

only 10-15 min away fr S.P. Setia & Mahsing project, priced at 468k is a good buy. the 2-storey type is highly preferred and has more room for appreciation. S.P. Setia selling & Mahsing selling at 800k & 755k. Heard Mahsing to increase price further after the recent fuel hike.

 
August 16, 2008 10:25 PM Anonymous said...

I have also booked 1 unit. email me at nancyteo896@yahoo.com for more information of the price and units available. My comment is that the built up area kind of small at 20' x 42' BUT they give big balcony to compensate the space

 
August 18, 2008 12:49 PM Anonymous said...

i was one of the buyers of PLB's taman jerjak indah. i don't have confidence in their project cos i have a worst experience on my unit purchased few years back.

the land sinked 3ft due to "cut corner" of piling, works, etc.

no doubt the selling price is cheap but it's not worth investing.

 
August 19, 2008 2:46 PM khorcf said...

that is good info sharing! kindly share more if you have any good or bad experience with plb. btw, where is tmn jerjak indah?

 
August 19, 2008 6:31 PM Uncle said...

Hi,
I booked a unit last 2 weeks. The developer told me they are going to do better and good workmanship for this project. They also realised that their earlier sub contractors are not really good. They are doing the show house at site now. Anyway my concert is not many developer is developing or building 2 storey terrace house, RM468k is reasonable. Hope PLB really considering their workmanship and their image.

 
August 19, 2008 7:10 PM Anonymous said...

taman jerjak indah is at pantai jerjak, somewhere near century service apartment.

the main contractor for taman jerjak indah was gaintrend. not sure prestige heights.

but location wise, it's just next to low cost saujana heights which is not to my preference.

 
August 20, 2008 9:44 AM Anonymous said...

worth to invest for double storey shop office in this project? is the location ok? Intermediate unit price is RM650K, size is 20x58. Please advise. thanks.

 
August 20, 2008 10:16 AM Anonymous said...

only few units and small size. no catchment for that area

 
August 20, 2008 11:46 AM Anonymous said...

hi,
Wat about comparing Sg. Tiram (Behind Star building) at RM520k to this project?
Sg. Tiram, DST, 20x70, OC obtained. Priced at RM520k (neg)
Prestige Heights, DST, 20x65, priced at RM468k.
M considering both but location wise, Sg.Tiram seems better coz nearer and more accessible.

 
August 20, 2008 1:09 PM Anonymous said...

Sg. Tiram, DST still available? From which developer?

 
August 20, 2008 1:15 PM Anonymous said...

of coz sg tiram

 
August 22, 2008 1:37 AM Anonymous said...

is the sg tiram one still available?? anyway i went to enquire at plb's office in pg.. the sales person told me that i would need to pay to a lawyer instead of the developer... i am relatively new at this.. is this actually safe?? and those who have paid... are u confident this is a safe method of purchasing it?? pls advise..

 
August 22, 2008 10:19 AM khorcf said...

I have seen the Sg Tiram project but dont really like the interior design and layout. Can judge it yourself. I paid to the lawyer too and gotten the receipt. Think shouldn't be an issue.

 
August 22, 2008 11:13 AM Anonymous said...

I just went to Balik Pulau at Jalan Pondok Upeh new DST house launching by Nyaman Developer, the price is 342k, LA 20'x70, BU 20'x45'.The show unit looks good. OC will obtain by Jun next year,

another new DST house 500m far from the Nyaman project with OC obtained. The launching price is around 250k but now the sub sell price is 320k. LA is 20'x70, BU 20'x40 but with extra 7' for future expand for wet kitchen.

Which one worth to buy? any comment?

 
August 24, 2008 9:43 AM Anonymous said...

if you booking b4 31 Aug 08 for Nyaman developer, you can get rebate ~RM8k, but thistwo project location is too far from Balik Pulau town area. this two project is Ok for living, but not for subsell/investment bcos alot of property at Balik Pulau area subsell is very poor response. Pls re-consider b4 booking.......

 
August 24, 2008 11:03 PM Anonymous said...

In terms of location Sg Tiram is much nearer and better. However, one major drawback for DST in Sg tiram is the ceiling height of the house is low. And the design and layout is not good. I've also paid a deposit for Prestige heights. I hope it will turn out to be a good location as Teluk Kumbar is situated in the south west of Penang which is very auspicious especially in the Period 8.

 
September 8, 2008 4:50 PM tyh said...

prestige heights - any detail spec. ?

 
September 9, 2008 6:07 PM kh said...

the S&P will take place this mid of sept, just had a call fr the lawyer office

 
September 9, 2008 6:36 PM KH said...

Another problem is the show unit will only be ready in Oct, so cannot see the unit before signing the S&P. The specification sound good but unconfirm until permit is obtain from the G.

 
September 11, 2008 12:30 PM tyh said...

spec. will be in S&P ?

So fast DST sold out? Not even with approval and spec.?

semiD ok for invest?

 
September 11, 2008 12:36 PM tyh said...

drop me an email pls, tyhtpy@gmail.com , just to keep in touch and sharing information

 
September 13, 2008 7:48 AM KH said...

Not sure it was 100% sold out for the DST, you can check with PLB.

 
September 13, 2008 10:54 PM Chooi Lean said...

As at Thur, I understand that there are still 3 units 2-storey terrace available i.e. Unit 42,43 & 87. Unit 43 & 87 are the better lots.

 
October 2, 2008 1:57 PM KH said...

I have just read the specification for DST, sounds good.

 
October 6, 2008 4:44 PM P said...

Hi guys,did urs notices that Opposite Prestige Height site got one project name: Teluk Kumbar height and they selling at RM267k for 20x70 double storey terrace hse.
The land owner is TPPT who is one of the subsidary of Bank Negara.They also plan to launch Phase 2 double storey and three storey terrace hse by end of this yrs.I believe the price will grow up but definitely less than RM400k cause this project is semi-govern and not allow to sell higher price in that area.If interested,you can call this number
:04-6491221 and the sales office name Southdown located at the site there.

 
October 6, 2008 11:32 PM KH said...

Hi,

Are you sure they are selling at RM67k for DST?
The last time I know was back in year 2004. See the link:
http://www.hba.org.my/news/2004/304/rm1.htm

I don't see any work start yet.

 
October 7, 2008 10:14 AM yi said...

sold out , at 267K , located inside, can't see from the road.
phase 2 no more DST ,TST only , price should > 700K
in future , hard to find DST
not believe ,call them

 
October 7, 2008 2:49 PM Soon Thiam said...

RM267K? this guy should be something wrong la!

 
October 7, 2008 4:20 PM penangcool said...

Hi P,

where got DST house cheap like this. Don't say DST, probabaly SST may not to get with this price....use your brain la before you post your comment.

Probably the roofing material used the cocoanut leaf and the wall use the cupboard!!

 
October 8, 2008 3:23 PM P said...

Hi guys,i brought one unit double storey terrace in teluk kumbar height last yrs end and the price is RM 267k only for Phase 1.u can go to their office to ask for brochure and call them to confirm the price.

Find out urself and i heard from the developer that they will launch next yrs and selling price for second phase is below RM500k.

 
October 9, 2008 11:29 AM P said...

Hi Penangcool,

Pls call and check it yourself.I brought one unit double storey terrace last year in Teluk kumbar Height for only RM267k.Even Phase 2 will be launching next yrs with 3storey and double storey terrace.Price should not more than RM500k cause the price was control and land own by TPPT(Bank Negara).

 
October 14, 2008 6:23 PM KH said...

Anyone already sign the S&P? The developer has 5 Banks as panel, which one you think is the best? Fr my point of view, Maybank so far is the best with 0% 1st year and BLR-2.2% for subsequence year.

 
October 15, 2008 5:34 PM Anna said...

Is there anyone buying the Semi-D? The design and layout looks nice coupled with wide land area. Any comments on it?

 
October 16, 2008 9:58 PM Su said...

I've a unit of DST available with good location. Anyone interested, pls call me at 012-4766370.

 
October 18, 2008 8:12 PM san said...

I have seen the show units.
Everything seems good except the orange-yellowish colour does not match the other colours. Is it possible to request PLB to change the colour?

 
October 28, 2008 10:26 PM san said...

pei, have you booked yourself a unit?

 
October 29, 2008 1:56 PM Su said...

Pei, I've a unit of DST which I'm thinking of letting go. Let me know if you are interested.

 
October 30, 2008 5:13 AM KH said...

is the show unit now ready for viewing?

 
October 30, 2008 3:21 PM ling said...

hi, is this project good for invest? i mean after completion how much we can sell? can anyone share with your experience?

 
November 7, 2008 10:12 AM may said...

Dear Hiang, I have deposited a unit in the earlier state. If you are interested please call me at 016-4430590 May. Price negotiable.

 
November 7, 2008 12:14 PM Deric said...

i got 1 unit willing to sell at original price...call me Deric-0164598788

 
November 9, 2008 12:18 AM P said...

Hi Deric,how much ur original price that you plan to sell?Did you already sign S&P?

 
November 9, 2008 8:39 PM KH said...

Show unit now open for viewing, but the DST now at RM488k.

 
December 18, 2008 1:20 PM Anonymous said...

don't rush. I think the proce will going down soonest.

 
December 19, 2008 10:05 AM recycleable said...

any unit available ,can accept RM488k + 10k , serious buyer , let me know your contact

 
December 19, 2008 11:58 AM P said...

Hi Recycleable,I got one unit for sales in Teluk Kumbar Height for RM468k nett.Just opposite Prestige Height.The land size is 20x70 and build up is 20x42.

 
December 19, 2008 12:26 PM recycleable said...

thanks P, i know teluk kumbar height, but prefer to wait until show house ready.To me Prestige Heights worth to buy because of attractive spec., show house ready , but I am too late, only left semi D, too expensive for a small family

 
December 20, 2008 12:10 AM Anonymous said...

Hi! Recycleable, i got a unit. pls email me ur contact no & name to lynn_6363@hotmail.com so that i can contact u for further info.

 
December 22, 2008 2:56 PM Anonymous said...

I own a unit of Prestige Heights DST. If you're interested, pls contact me at Doramoto@gmail.com

 
January 23, 2009 4:22 PM Anonymous said...

am interested on Prestige Height, how much you wanted to sell ? anyone know whether developer has any units available ?

 
January 27, 2009 11:59 AM KH said...

DST only left bumi lots, i think the new DSSD is still avaliable but the price is 628k which i think is a bit high.

 
February 5, 2009 1:47 PM fredphua said...

Hi,I'm serious buyer looking for DST in Prestige Height.Anyone who interested to sell kindly contact 012-4601196. Thanks.

 
February 12, 2009 5:50 PM manchai said...

I also interest on DST for Prestige Height, Anyone plan to sold maybe can email me. manchaitarc@gmail.com

 
February 19, 2009 1:22 AM astina18 said...

Hi, I'm looking for DST too, pls email me your pricing and detail at astina18@yahoo.com tks!

 
March 2, 2009 2:27 PM sQu@ll said...

I got one unit of DST to sell, please email me for more information. squallck77@hotmail.com

 
March 10, 2009 8:57 AM Kin said...

Will the be any property price drop due to economic situation?

 
March 10, 2009 11:09 PM KH said...

New DST for Penang is now become less. As long as the demand is more than supply, price will not drop.

 
March 22, 2009 3:37 PM Giap Yong said...

Serious buyer for DST at Prestige Heights. Could you email me at giapyong79@yahoo.com?

 
March 22, 2009 11:31 PM poh chiu said...

hi i'm looking for DST at Prestige Heights too,

Please do email me if you plan to let go ur unit.

thanks!! (pohchiu@gmail.com)

 
March 27, 2009 12:33 PM yinpeiwei said...

Check on site , some DST already built up to roof, but 3SSD still in the stage of clearing land / stone. When DST completed , owner have to start pay for loan interest , but OC will only be process until whole project finish.

Anybody know OC will be obtain in 2 years after S&P or only completed in 2 years but OC after that.

 
March 31, 2009 9:08 PM yellow man said...

Go to see the show room today on DST and TST, build up quite small but the concept is good. DST only left corner unit and selling 590k onward. The DST corner is not so good as the land mostly is triangular shape. Another thing is that some of the DSSD is very near to Saujana Height which is the only flat there. Selling price is from 628000. No gated service of cause no need to pay those stupid maintenance fee but a bit risky because the place so quiet. Location also not bad, located near Bayan Lepas.

yinpeiwei..
I think the project should complete all before the OC can be obtain otherwise how the MPPP staff going to inspect and get approve if the road or drain still build halfway?

 
April 17, 2009 11:09 AM Deric said...

i got 1 unit dst for sale..interested pls cal 0164598788 for mre details

 
April 20, 2009 2:20 PM waren said...

is the semi d still available?

 
April 28, 2009 1:56 PM KY said...

Hi waren, I was there last week, and semi d still available.

 
May 3, 2009 7:54 PM Eve said...

Hi Deric! Is your dst prextige heights still available? Around how much u wish to sell for your dst prestige heights? Thanks..

 
May 3, 2009 8:48 PM Eve said...

Anyone wish to sell out the dst prestige heights? Around how much? I'm really interested in

 
May 8, 2009 3:00 PM Lim said...

i had when to view show house on last week, nice workmanship, value for money & good for invest too.
i hear developer sale person say still left 4 units DST available... can go to have a look or pls call sale office 04-6491799...

 
May 8, 2009 3:23 PM Paul Choong said...

Hi Lim, just saw the project. Feel that 3ST is a good buy bec only have to pay xtra RM80K compare with DST. All specs are the same. No 3ST is selling at this price. If anyone have this "jalan", pls let me know.

 
May 8, 2009 3:38 PM Sam said...

Hi Paul, i agree what u say , yup is worth to buy for 3 storey terrace at here, bcoz i done a survey it seem near by that location other development are very expensive.
I just visited plbhomes website, it seem they hv new project at Jelutong area. May be u can with developer.

 
May 8, 2009 4:40 PM Ang said...

Better study carefully for the past project of this Teluk Kumbar Heights!!! i hear tht this project had abandon so long liao loh... dun be a second stupid ppl like "P"!!! in the world where got so cheap punya rumah untuk dijual leh???

 
May 10, 2009 8:59 AM KH said...

Developer say they can finish the construction by end of this year.

 
May 11, 2009 12:47 AM yinpeiwei said...

If the OC only obtain after 2 year , what is the benefits to the owners if completed in 1 year
? Owner will need to pay more bank interest .
Look at the site progress , DST and TST owner will have to wait for the semi D to complete first before de for developer proceed for OC.
So ,PLB please make sure all the units completed in the same time !

 
May 11, 2009 12:36 PM KY said...

by end of the year, should be no problem to finish the constrution, as front house near to shoplot look like 70% completed. I was there last Sunday.

 
May 25, 2009 2:36 PM paul said...

can buy but very difficult to sell later

the gimmic is giving high end fitting like stainless steel gate n staircase railing...

but good thing come to divert your attention....
and the house size n land area is small


i rather go for batu maung area.... where appreaciation of property will be more higher due to second link.

 
May 26, 2009 5:23 PM CL said...

2 years completion includes OC. If they failed to deliver with water and electricity connected to the building - not only building completed and key handover. Purchaser can claim Late Delivery Compensation of 10%. Dont have to appoint lawyer, just go to the Purchaser Tribunal Court, fill in the form and pay RM10.00. Looking at the speed, PLB will be able to deliver on time.

 
May 28, 2009 12:40 PM ew said...

check on the site , my unit at the first row near to the main road or shop lot was almost completed .
Very fast. Hope the developer will process / apply OC as fast as the construction job .No meaning for completed my unit in 1 year but obtain OC after 2 year.

anyone know about title transfer , when ?

 
June 1, 2009 12:39 PM KY said...

Ew, i received letter from PLB, they have issued Individual Title, and the law firm will contact me soon for the transfer.
Hope we can share some info among ourselves.

 
June 9, 2009 11:39 AM CapzFelix said...

Head for the TST, left the show unit only. Cost RM735k inclusive of MOT, renovation and furniture...

 
June 10, 2009 3:35 PM CapzFelix said...

I just got confirmation from PLB Home. Prestige Height OC date is tentatively 3rd quarter of 2010. DST have to wait for Semi-D to complete to get OC together. That's the procedure.

For DST, left 3 end corner lot price range from RM550k to RM600k.

 
June 11, 2009 12:29 PM gon said...

My S&P dated Oct/2008 , I thought PLB have to obtaib OC in 2 years time from Oct/2008.
So far paid 50& for my DST already , almost completed .

Sure have need to wait for semi D for OC .

Then for what they build my unit so fast ?
I am paying more bank interest !!

Anybody sign S&P earlier than Oct/2008 ?

 
June 11, 2009 4:33 PM KY said...

This is for sure developer has to wait all houses completed then apply for OC.

 
June 11, 2009 5:44 PM KH said...

My unit is > 60% completed, how come hv to wait another 1 yrs from now for OC. The DSSD just 14 units I guess, should be fast as they already started construction. Luckly 1st yr is 0% interest.

 
June 12, 2009 1:29 PM gon said...

Every owner give PLB a call. 'BomB' them , pressure them to complete semi D faster.
They can finish DST and 3ST so fast , how come they need 1 and 1/2 years to complete 14 unit semi D which construction already start few months ago.
If PLB want to promote their reputation in Penang , they should always put the benefits of house owner at the 1st place !

 
June 17, 2009 10:21 PM CL said...

Developer will have to complete unit by 24 months from date of SPA. If signed SPA 28 Oct 2008, then contract expires in 27 Oct 2010. OC means that building is connected with water and electricity supply. If they are late, purchasers are entitled to 10% LAD compensation even for 1 day delay. Hope this is clear

 
June 19, 2009 5:03 PM fredphua said...

Anyone interested to sell Prestige Height DST? I'm a serious buyer. Kindly drop me note fredphua@gmail.com or 012-4601196. Thanks.

 
June 26, 2009 10:02 PM Muhsin said...

They cannot work on the semi-D very fast because of the ground there full of rock, need to blast it first. That why they work DST 1st, but now they are working on the Semi-D. And for your information, there are 3 unit left for DST, it is at corner units.

 
June 29, 2009 11:22 AM CapzFelix said...

From my understanding in S&P, if the document stated within 2 years, they have to pass you the key by that period of time. This doesn't means that OC has to be granted together with the key issuing out. They can pass you the key without obtaining any OC first. That's the loophole in HDA.

 
July 1, 2009 3:19 PM khorcf said...

Hi,
Anyone plans to do the aircond piping so that dont have to hack the wall again after completion? I plan to do that but just would like to understand the pro and con.

 
July 1, 2009 4:30 PM KY said...

Hi Khorcf
Yes, I'm interested to install aircond piping, if you have any information, please let me know.

 
July 1, 2009 4:41 PM khorcf said...

Hi KY,
I just engaged with one fren's introduced subcontractor and is currently waiting for quotation. Will let you know once I got it. BTW, pls give me ur email so that we can keep in touch for any progress and sharing.

 
July 2, 2009 11:16 AM KY said...
This comment has been removed by the author.
July 4, 2009 6:14 PM CL said...

vacant possession means issuance of Borang E = within 14 days OC issued. MPPP is now under ISO, thus no full compliance they cannot apply for OC. Without Borang E = they cannot handover v.p. Architect would not issue certificate. If they do, we can file complaint with PIAM. No architect will risk this to have their licence GANTUNG!

 
July 9, 2009 12:09 PM gon said...
This comment has been removed by the author.
July 9, 2009 12:23 PM gon said...

checked on site , drainage job started at DST , painting of shoplot started , semiD progress slow compare with the progress of DST .
If PLB speed up the progress in semiD , OC by 1st quarter of 2010 is possible.

To owner , time = money . So PLB please speed up semiD progress , don't let DST and TST wait for semiD for OC.

 
July 13, 2009 4:45 PM ew said...

Received letter to execute tittle transfer.
Any concern if I wait until nearly get OC then execute tittle transfer?
Bank will release how many percent of payment to PLB after executed tittle transfer ?I am trying to avoid paying more bank interest .
What is the point to get tittle transfer now if the OC is on next year Oct.

 
July 29, 2009 12:11 AM CapzFelix said...

Irrespective of whether you sign the title transfer earlier or later, it won't hinder the developer from asking progressive payment from your bank when the time comes. I'm not sure about which bank you take, if you don't have title transferred, they might not release fund to the developer unless they lodge a private caveat on the master title.

I'm not sure whether the stamp duty of the title transfer is paid by you or developer coz the stamp duty charged is based on your property value. If you wait till OC to sign it, the value will increase and it might affect the amount of stamp duty charged.

 
August 11, 2009 11:01 AM KW said...

Hi, I am interesting on the semi-D, any units pls contact emkwl@yahoo.com. Thx.

 
September 2, 2009 5:09 PM khorcf said...

got the last unit of semi-D to let go..but must be fast. pls email your contact to khorcf@gmail.com. tq

 
September 3, 2009 2:04 PM fredphua said...

any one have Prestige Height DST like to let go? Please email to fredphua@gmail.com. TQ

 
September 6, 2009 11:10 AM KW said...

Hi, Anyone would like to let go any semi-D plot#11 to plot#14, pls contact me at emkwl@yahoo.com. Thx.

 
October 4, 2009 12:00 PM bryan said...

Hi,
I am interested on the DST & TST, anyone would like to let go their unit please email me at bryanwongcw@hotmail.com...thanks.

 
October 27, 2009 11:34 AM fredphua said...

Dear Prestige Height owner,

Anyone interested to let go DST immediate unit before 5% property gain tax impose from Jan 2010? Please contact me fredphua@gmail.com. Thnx.

 
October 27, 2009 1:46 PM bang said...

What is the reasonable sub sale price at this moment ?
Seem like mostly are buyer for own stay. Or wait for OC then sell ?

 
October 27, 2009 4:36 PM KY said...

Hi Fredphua, look like you have posted many times in this blog, looking for seller, how much you can give for DST conner?

 
October 28, 2009 8:23 AM fredphua said...

Hi KY, thanks for the query. I'm looking for DST intermediate unit cause my wife doesn't like corner unit. Some of the owner did contact me but is offering me corner unit also. Really hope that some intermediate unit owner will contact me and done the deal.

 
October 29, 2009 12:31 PM bang said...
This comment has been removed by the author.
November 28, 2009 5:00 PM Yeh Moin said...

anyone want to sell their unit from 16-27 and 60-71 including corner unit can email me at ymtang515@yahoo.com

Thank you.

 
December 14, 2009 7:06 PM Amy Wong said...

I'm interested in intermediate or corner unit. Please contact me at danamy2@gmail.com

 
December 26, 2009 2:28 PM M said...

Hi Everyone, Happy New Year. I've been following all your comments with greatest interest. I am hoping to return to penang and would like to get a landed property. My worry is: are there issues with houses been rented out to foreign workers who jam 10-20 people in one house. In Klang Valley, these people bath, eat, and make noise throughout the night. thanks.

 
December 26, 2009 2:30 PM M said...

Anyone know what is the current 3-storey terrace is now? thanks.

 
December 27, 2009 6:34 PM KW said...

Hi M,

U can try to call PLB Sales Persons:
http://plbhomes.com.my/showcase/prestigeheights/prestigeheights.asp

I think they still have show unit.

 
December 28, 2009 2:41 PM KhaYan said...

Anyone interested in Vanilla Bay, Sg Batu?
20*75 double storey linked house, free hold, oc obtained.

Please call 012-5286018

 
January 27, 2010 6:32 AM KH said...

Prestige Height VP will be somewhere April this year and OC on May, latest info from developer.

 
January 27, 2010 10:15 AM Mav said...

Anyone has good contacts recommendation for interior designer/renocation? I would need to do up on the kitchen only, and some other basic amenities like aircond piping, cabling, lighting, etc. Need to budget for other stuff like furnitures and all :)

 
January 27, 2010 10:18 AM Mav said...

Anyone knows if the road leading into Prestige Heights will ever be expanded? My take is unless it is widened and improve on, the traffic jam and headache will be a big worry when we move in :( I know they are doing some 1-way traffic surrounding the police station area but will it help? The bottleneck is still at the traffic lights, sigh...

 
January 28, 2010 1:40 PM bang said...

are you sure oc on may ?
construction almost completed , why need 5 more months
if well plan , construction should completed already and aim for oc on mac.
plb need to put more effort to promote their reputation , otherwise selling at lower price and quality material also won' help much
by he way , anybody want to sell their unit ?

 
January 28, 2010 10:18 PM 511 said...

Anyone knows when the deadline for settling transfer of title is?

 
January 28, 2010 10:34 PM kevin said...

anyone knows what is the value of PH now?

 
March 3, 2010 9:16 PM tkguy said...

plb really slow , i pass through everyday , not many peoples working , progress very slow recently . 3 months ago i thought can finish in 2 months time , but now seem like still got 3 months more to wait

price ? depend on supply & demand , + how good plb & investor 'goreng'

 
March 3, 2010 11:18 PM KK said...

ya... really really slow. i passed by southbay and prestige height almost everyday. southbay is super fast, prestige is super slow.

 
March 4, 2010 10:54 PM KW said...

Project start Q3'08, S&P Sept'08, if can get OC ready by June'10, still one quater ahead of normal trend 24 months after fist buyer sign S&P, I would say PLB done a great jobs.

Fyi, another project at Jelutong.
http://www.fullhouse.com.my/public/pub_launching_soon_detail.asp?launch_id=22

 
March 5, 2010 1:14 PM tkguy said...

No , PLB just done a job , not a great job at all
PLB start with 100km/h speed , but then slow down to 30km/h or even slower at this moment.

PLB was not trying their big best to complete the project earlier for the benefits of buyers/investors.

If they keep at 100km/h , I guess now already occupied or subsale start.

Due to poor planning , it seem like now left some small stuff here and there , I doubt they can obtain OC by June. May be end up OC on Oct , just on time - may be is PLB TARGET.

Price appreciation of PLB project always not so good , they must do something else to attract buyers/investors. If target to be ON TIME only, why should we invest on their project. If they can complete in 1 year , eventhough price appreciation not as good as other developer , we can still consider.

Sunway new project Arpira near by , DST at 495000 , not bad , Sunway project price always appreciat a lot.
Thinks twice for PLB Jelutong project , do consider their job at Prestige Height , super slow !!!

 
March 5, 2010 9:22 PM KY said...

As long as PLB can complete within the time frame,& obtain OC on time, who care 100 or 30km/h?!

 
March 5, 2010 10:33 PM KW said...

Haha, think twice for PLB Jelutong? check this out.. http://www.apartment-penang.com/2009/09/bukit-dumbar-residences.html?showComment=1259924207458#c2782140003648240865
if this is true, then need to be very rich only can grab the remaining... just becaue 'think twice' and not in time to get the lower price...

 
March 6, 2010 4:57 PM tkguy said...

ky ky , you know what are you talking about or not ? Who care about OC ?
Only 2 group of owners , 1 is investor , they want OC as soon as possible to sell their unit , earn some money and move to invest in other project. The other 1 is those buy for own stay , they may be rent a house now , they don't care about OC ? they don;t want to move in as soon as possible ?
They are all paying bank interest , if buy with cash also , peoples want OC as soon as possible .

All about money , time is money .

KW , peoples thinks twice to invest on PLB project , but may go straight for project by other trusted developer .

If PLB don't willing to try their best to complete project as soon as possible , why must peoples wasting money and time on their project .So many many new projects coming .

You can go and check on site , I pass through everyday , less than 10 peoples working here and there , don't know what kind of developer doing what kind of planning ?

 
March 7, 2010 10:23 PM KY said...

tkguy. Go ahead sue PLB because 30km/h,see who is right who is wrong. Making so many noise here for what?!

 
March 8, 2010 12:46 PM YMC said...

tkguy: u sounded like a person who never bought a house before and keep rushing developer for completion. This is a very silly act. I rather have everything done up to expectation as long as it meets the deadline. Perhaps you have never deal with other rude developer before and kept condemning on PLB. Prestige Jelutong responses are so good that it doesn't need launching or for people like you to comment on it. Southbay contruction only started lately despite it's first launch date which was more a year ago.

 
March 8, 2010 3:28 PM bang said...

YMC , u represent the developer ?
got unit for sale ?
can give me your contact ?

tkguy , no worry , PLB already gotte your message
problem is they have limited capability
waitlah , be understanding , that is why they sell at so low price , your 1st house ? not bad ah , 1st house already buy DST , wanna sell ?

 
March 8, 2010 5:38 PM YMC said...

bang: nope, i only own a unit. But at the moment I don't intend to sell. Heard the price for DSSD already gone up to $750k last year. Can hardly find any developer nowadays who can entertain our concern & complain except PLB.

 
March 8, 2010 7:58 PM KW said...

在伊索寓言中有个《狐狸与葡萄》的故事,说的是那狐狸本来是很想得到已经熟透了的葡萄的,它跳起来,未够高,又跳起来,再跳起来……想吃葡萄而又跳得不够高,,这也算是一种"挫折"或"心理压力"了,此时此刻那狐狸该怎么办呢?若是一个劲地跳下去,就是累死也还是跳不够那葡萄的高度。于是,那狐狸说:"反正这葡萄是酸的。''言外之意是反正那葡萄也不能吃,即使跳得够高,摘得到也还是"不能吃",这样,狐狸也就"心安理得"地走开,去寻找其他好吃的食物去了。

 
March 8, 2010 10:30 PM tkguy said...

oh ymc u own an unit ?
but u sounded like the plb staff
owners should happy to get oc faster , why u so big responde when i hammer plb to move faster, only plb staff will have hard feeling ,nothing to do with u right if u r owner?

anyway nobody care who r u in a blog , i just want plb to move faster so that i can 'moove' my money faster also
with plb project price appreciation , not much earn if oc just on time

if their price appreciation is good , no problem lah to wait 2 years , but .....
so move faster plb

kw , can u write in english , i not understand chinese leh
u always like this ah , orang cakap malay u jawab japan , better go chinese blog lah
sopan santun lah sikit

 
March 9, 2010 11:37 AM KY said...

tkguy: here is simple translation;
Hungry fox saw the vine hanging from a string of sparkling grapes. Saliva DC, you want to eat off, but can not catch. Watched a moment, no alternative but to walk, he walked himself consoled himself said: "This grape is not ripe, there certainly are sour."

 
March 9, 2010 12:29 PM bang said...

super lousy translation , don't know better keep quiet

tkguy , basically , KW means somebody trying to comfort themself after fail to grab an unit in PH by posting -ve comments about PH.

KW assume u posting -ve comments just because u fail to grab a unit in PH. You cannot get it , you then talk some thing bad about it.


Anyway , plb still doing a good job compare with teluk kumbar height , opposite ph. Don't compare plb with mahsing or sp setia . You will feel better if compare height with a typical short Japanese , don't compare with those >200cm tall American .Is this the philosophy of plb staff, KW , KY.
Sad sad ..... not me but the boss of plb

 
March 9, 2010 12:44 PM KY said...

eh!! who compared who? in my comment I never mentioned PLB compared with other developers, only those busy body compared it..haha!!

 
March 9, 2010 8:09 PM tkguy said...

ky, although I can't understand your translation , thank you .But no good say peoples busy body , peoples can say you are busy body also , translate KW comment , who ask you to translate ?

so now I faham ,kw trying to say that I am not owner and I am jealous
this kind of comment just ignore it , assume this and that , who care

I just care the progress , I wanna tell plb to move move move faster . Imagine you are at the high way with speed limit 110km/h , but in front of you is a not so old car but running at 50km/h at the fast lane .
sigh !
no worry , ky , kw , if you all r not from plb , then i guess u r worry my comment will affect the price appreciation . that will not happen. i only will sell if profit > 100k

do u thinks possible ? we talk something can benefits everybody ok ?

 
March 10, 2010 10:15 AM bang said...

KY , eh eh for what ? I am asking plb to move faster only , why u care so much if u r not plb staff ?

what are the projek nearby ?
sunway aspira selling at 495k , around same land size , not sure about quality , no show haouse , need wait 2 years
sunway tunas , now selling 600k ++ , same size, better location , > 5 years old house , ..
if ph at 468k + 100 k = 568k , why not go for sunway tunas ?
what else ? now everybody looking for huge profit , reasonable meh ?

 
March 10, 2010 4:24 PM KW said...

狐狸来了, 大家快跑...

 
March 10, 2010 8:08 PM AlexC said...

Anyone know what is the construction project opposite PH?

 
March 10, 2010 10:38 PM tkguy said...

siapa nak tolong translate
harap harap in KW tak tau english , bukan tak berani bahas
semacam u marah orang putih dengan malay , apa gunanya , nak marah orang , kenalah berani, takut sangat baik diam saja
macam tikuslah , sembunyi kat tempat gelap , orang takda ia keluar curi makan
dalam malay ini khas untuk KW yang buta english

opposite is teluk kumbar height

 
March 11, 2010 12:38 AM Be peace said...

aiyo, beli rmh pun mau gaduh, apalah dunia kini kalo tak ada undang2 mcm mn ya pasti mcm dunia tak bertamadun. Spt yg kita lht skrg. Sikit2 gdh dunia mn blh aman. Mua2 suka sindir sini sana mcm org yg tak sek, mungkin mo tunjuk belang, maklumlah tahun hari hari mau gaduh.

 
March 11, 2010 10:59 AM KY said...

tkguy. sorry my english is lousy I dare not translate anymore.
bang is the right person to translate for you.

 
March 11, 2010 11:05 AM bang said...

kalau semua tau bersopan santun , hidup amanlah

all start when tkguy hammer on plb for faster OC.
KW and KY trying to protect plb but claim they r not from plb

some more got peoples try to use their own langguage . is normal if u get angry when u ask in malay , peoples talk to u in english , but in fact he know english

for what doing that

understand what , owners pay with hard earn money , sure want to get oc faster , can save money , if 1 months u pay RM500 interest , OC earlier 6 months mean u save 3000 . can buy LCD already

May be this kw ky orang kaya tak kisah , but why busy body when others orang miskin want plb to move faster , if u r not from plb , why care so much DIAM sja lah

 
March 11, 2010 11:09 AM bang said...

tkguy , just ignore kw , orang macam ini tak payah layan, i saw he write in english in other project

 
March 11, 2010 11:39 AM KY said...

see tkguy, people says you were the one who started it. Good luck to you and さよなら.

 
March 11, 2010 10:08 PM tkguy said...

ok i ignore this kw ky cari gaduh saja tau

buang masa saja , gaduh dengan tikus buat apa

adik beradik kut , perangai sama saja

baik call plb office esok ,hamtam kat kuat

 
March 12, 2010 9:45 AM AJ said...

luckily this tkguy is only investor...hopefully we will not have this type of attitude neighbour who likes to hamtam whenever there's opportunity. No wonder there's no peace on earth.

 
March 12, 2010 12:23 PM bang said...

AJ you want a neighbour like kw ky ? You want a neighbour like them , when u talk hokkien , they unswer in Japan , but in fact they know hokkien.

manusia dari mana tak tau sopan santun langsung

tkguy investor , want profit only , is ok to owner , let him work for you , hamtam developer move faster .
tak rugi sebagai owners kalau dapat oc cepat
peduli apa dia mau hamtam PLB
PLB staff saja perlu risau , kw ky ??

 
March 12, 2010 7:08 PM KW said...

猫哭老鼠...

 
March 13, 2010 10:41 PM Lacy said...

For Sale

LA : 1400 BU : 1680
Intermediate unit
598k

Property Negotiator
Lacy Tan 012.493 0728

 
March 15, 2010 11:58 AM tkguy said...

u see , LA 1400 , OC in May , but asking for < 600k . Some more with stainless steel gate , .....
That is why , don;t expect too much from plb project . Hamtam kaut kuat plb to complete faster , move move move ...
Location so near to factory new road also coming up soon , still so cheap.
Balik Pulau new project alrady near 500K ,

 
March 17, 2010 10:13 AM Kenny said...

I am a serious buyer, interested in DST. Please send me a mail at KennyChengTT@gmail.com with your offer price.

 
April 1, 2010 10:41 PM KH said...

Completed stage 2(H) today....

 
April 6, 2010 12:17 AM Cheang said...

I am looking for shop lot. Anyone want to sell, pls kindly email me - cheang.cheawjye@gmail.com

 
April 6, 2010 4:10 PM tkguy said...

oh , completed 2H already ,meaning next is vp

rememebr someone said OC on April right ? now just completed 2H ?

jangan jangan tunggu sampai akhir tahun oc baru dapat , siapa tau , kan PLB project , biasa lah

KW KY kerja kuat sikit ah , jangan loh pandai lepak kat blog saja

 
April 11, 2010 3:05 PM KengNee said...

I visited the site 4/4. The tar road seems 2 inches lower than the bottom level of pavement cement. It looks incomplete of tar road actually. Furthermore, some houses' wall at outside are not painted yet. When you look in details, the lower part of car porch wall also haven't complete the touch up. I wonder PLB and Architect were doing their job prior collect the payment for 2H stage.

 
April 12, 2010 11:15 AM tkguy said...

KengNee , r u 1 of the owner ?
I too loose my patient , it seem like there are plenty of small stuff here and there to complete. Here got something to paint , there got rubbish to clear , .......
I really doubt PLB capability, never finish like that.

 
April 12, 2010 1:38 PM YM said...

Hi KengNee & TKguy, are you both PH home owners?
Let me know if you are interested in knowing the BLR mgmt for housing loan. You can email me at homeloan.society@gmail.com

 
April 14, 2010 10:25 AM Rottmika said...

KengNee & Tkguy,

I went to the site last friday. those tar are the 1st layer only and not the final layer. This was confirm by the site guy. Anyway, I wonder when was the 1st ever SPA signed by PH buyer?

 
April 14, 2010 11:43 AM KengNee said...

Thanks to Rottmika.

Why 2H notice was issued 30-Mar to buyers since it is incomplete? It means PLB is cheating all the buyers. Business ethical has thrown in the drainage. Buyers are paying interests everyday.

 
April 14, 2010 11:05 PM bang said...

really ?

jangan jangan oc akhir tahun

2 3 orang kerja , cat sini cat sana , buang itu buang ini ,....

orang melayu kata tak habis habis

 
April 15, 2010 11:36 AM Rottmika said...

KengNee,
I agree with you and I checked with a friend of mine who is a retired architect. He confirms that those days architect would wait until the full completion before issuing the cert but not now. He claims that it is still acceptable for the architect to issue the cert 2(h) when they completed the binder layer

 
April 15, 2010 3:25 PM YM said...
This comment has been removed by the author.
April 15, 2010 3:26 PM YM said...

Is there anything we could do to appeal/complaint? The retaining wall infront of PH looks so filthy and bare. There's no proper landmark or nice entrance leading to PH unlike other housing projects. There're also very few lamp posts installed along the houses. :(

 
April 15, 2010 11:22 PM Adrian said...

I'm one of the unlucky owner where the TNB switch box is being build in front of my unit. Due to this,I can't break the wall for two cars to go into my porch.
There is a lot of units that facing this issue.
I have check with PLB & they feed back that this is due to the wiring method where cable is being put under ground. Sadly this cannot be move away oredi.

 
April 16, 2010 10:35 AM KengNee said...

According to agreement, it said completion, means 100%. Nothing mention 1st layer or binder layer.
Anyone has friend who is legal advosor? please ask around. We want 3rd party opinions, but not developer or architect.
I found this web is useful. Feel free to read. http://www.hba.org.my/main.htm
Perhaps forming residents' associations can pressure PLB.

 
April 16, 2010 10:51 AM CL said...

should refer to PIAM on the certification, not the lawyer. PIAM have a guideline and if the architect abuse it, licence can be gantong. Usually the architect would not take this risk cos not worth it.

 
April 16, 2010 11:17 AM tkguy said...

in front of your unit ? They are not placing it in between 2 unit ? So stupid ?

Why not , go direct to TNB , they can help.

 
April 16, 2010 11:50 AM YM said...

Hi,
Please contact me on ways to save your home loan interest by more than half and pay in shorter tenure. This is very beneficial to you. Email me at homeloan.society@gmail.com

 
April 16, 2010 4:20 PM AJ said...

Adrian, TNB can help. All u need to do is to pay them. Some homeowners even manage to approach them to remove the electrical post directly in front of their house.

 
April 20, 2010 9:47 PM KH said...

sometimes is good to have a light shine in front of your gate, you will feel more secure.

 
April 21, 2010 10:00 AM presitgeheights said...

was there yesterday ,everything seem nice to me,
no electrical post , no hanging cable,
if plb plant some trees along all the street and add landmark at the entrance , it will look perfect .

 
April 21, 2010 11:13 AM Rottmika said...
This comment has been removed by the author.
April 21, 2010 11:28 AM Rottmika said...

I called up PLB office and the sales person told me that OC is possible in April. I'm not sure how true it is but I should say they are ahead of schedule. We shall wait and see

 
April 21, 2010 11:53 AM KengNee said...

I support greenery environment and unique landmark. It will help PLB promotes their reputation at least. Hopefully PLB can do something extra for prestige heights residence.

PLB, please think about it besides profits.

 
April 21, 2010 2:33 PM YM said...

I agree. PLB should plant Bucida Molineti(Geometry trees)along all the streets and build a proper landmark with a landscape. BTW, why does the street name is Tingkat Kampung Bukit? Why do they need to name streets "Kampung" this days and especially in places like PH?

 
April 21, 2010 2:52 PM spsetia said...

Now can see some real owners requesting this and that, good sign .

call PLB to request for it.

A simple landmark is good enough , just for identification , otherwise how to know where is prestige height , the road name is totally

 
April 22, 2010 1:59 PM David Choo said...

Yes PLB please, please, please plant trees and do and build nice landscaping.

 
April 22, 2010 5:28 PM Ooi said...

Anybody would like to sell DST? please email to me ooijiajie@gmail.com

 
April 23, 2010 9:40 AM Rottmika said...

Have to agree with David Choo..why are there no sign of any trees? If they claim that OC is anytime from now?

 
April 23, 2010 9:44 AM Rottmika said...

The main entrance gate has been locked and they are not allowing any visitors. I guess they are in the final stage of OC...should be ...anyone has other update on OC?

 
April 23, 2010 10:34 AM David Choo said...

According to PLB that all departments have been approved except MPPP. PLB is preparing keys for buyer now and OC is expected in 2 weeks time. Not sure how true.

 
April 23, 2010 11:23 AM spsetia said...

nothing left except painting, OC should be anytime from now
anybody for own stay ? mind to share you plan to mve in when ?
To me , I will move in as soon as possible after OC , but is good to have more resident move in around the same time.

That say OC early May , minor renovation will take < 1 month , if everything smooth , will move in around July , before the month of 'ghost'

 
April 23, 2010 11:34 AM Rottmika said...

Thanks David,
From my observation yesterday, everything is in order except I can't see any trees being planted. If they claim only pending MPPP then it is possible in 2 weeks time but I still think May should be the most possible.

 
April 23, 2010 3:26 PM David Choo said...

Plan to move in soon if ready early. Hope that more peaple will move in too.

 
«Oldest ‹Older   1 – 200 of 405   Newer› Newest»
Comments that contain property ads, marketing messages or links with advertising purposes will be deleted. Kindly visit Apartment Penang Classified for properties for sale and rent.